Vacuum
Pumping speed and gas load
Pumping speed S = dV ⁄ dt is a volume flow, i.e. the volume of gas passing through the pump; commonly used by manufacturers to characterize their pumps.
Gas load q ~ dm ⁄ dt is equivalent to a mass flow, i.e. the total number of molecules passing through the pump.
Evacuation time
| S [m³ ⁄ h] | 10⁰ mbar | 10⁻¹ mbar | 10⁻² mbar | 10⁻³ mbar | 10⁻⁴ mbar |
|---|---|---|---|---|---|
| 10 | 5 min | 6 min | 7 min | 9 min | 10 min |
| 20 | 3 min | 3 min | 4 min | 5 min | 5 min |
| 30 | 2 min | 2 min | 3 min | 3 min | 4 min |
| 40 | 2 min | 2 min | 2 min | 3 min | 3 min |
| 50 | 1 min | 2 min | 2 min | 2 min | 2 min |
| 60 | 1 min | 1 min | 2 min | 2 min | 2 min |
| 70 | 1 min | 1 min | 1 min | 2 min | 2 min |
| 80 | 1 min | 1 min | 1 min | 2 min | 2 min |
| 90 | 1 min | 1 min | 1 min | 1 min | 2 min |
| 100 | 1 min | 1 min | 1 min | 1 min | 1 min |
| For p0 = 1 013 mbar and V = 0.1 m3; rounded to the next integer | |||||
Requirements for high vacuum
| For high vacuum (and lower pressure) evacuation time and maintainable pressure are mainly determined by desorption and leakage rates. | |
|---|---|
| ≥ 10⁻⁴ mbar | Evacuation time is the sum of time for roughing pump and for vacuum pump (pressure may even be achieved with roughing pump only) ~ minutes |
| < 10⁻⁴ mbar | Evacuation is dominated by desorption fromchamber surfaceClean, smooth chamber surface is cruciale.g. turbo pump |
| < 10⁻⁶ mbar | Desorption of sealing material becomes relevantTurbo pump (possibly with assistance of ion getter pump) |
| < 10⁻⁸ mbar | Metal sealing is requiredIon getter pump is highly recommended |
| < 10⁻¹⁰ mbar | Leakage and permeation through chamber walls are no longer negligible |